1 Electric Pole Erection and Guyed Wire Installation
1.0.1 This chapter applies to the installation of 35kV and under overhead power lines.
1.0.2 The inspection for electric pole erection and guyed wire installation(including the equipment and raw material of power line)is shown in Table 1.0.2.
Table 1.0.2 Electric pole erection and guyed wire installation
Table 1.0.2(continued)
Table 1.0.2(continued)
Table 1.0.2(continued)